FACT CHECK DOCUMENTS
PLANNING APPLICATION UPDATE - JANUARY 2024
-
-
Chapter 5 - Changes to the Proposed Development
Chapter 4 - Site Location & Description
Chapter 5 - Changes to the Proposed Development
Chapter 6 - Legislative & Planning Policy Context
Chapter 8 - Ecology & Ornithology
Chapter 9 - Hydrology, Hydrogeology & Flood Risk
Chapter 10 - Ground Conditions & Contamination
Chapter 11 - Cultural Heritage & Archaeology
Chapter 14 - Traffic & Transport
Chapter 16 - Sustainability
Chapter 17 - Interaction & Accumulations of Effects
Chapter 18 - Conclusions
-
ESA V2 Cover page and Contents
ESA V2 Fig 2-1 Cumulative Sites Plan
ESA V2 Fig 5-1 Sandstone Bund Profiles
ESA V2 Fig 5-2 Example Extraction Method Plan
ESA V2 Fig 5-3 Indicative Wet Working Process
ESA V2 Fig 5-4 Indicative Proposed Landscape and Amenity Mitigation
ESA V2 Fig 7-4 Bare Earth ZTV with Viewpoint Locations
ESA V2 Fig 7-5 Screened ZTV with Viewpoint Locations
ESA V2 Fig 7-10 Cumulative Sites
ESA V2 Fig 7-12 Indicative Restoration Masterplan
ESA V2 Fig 7-12a Restoration Masterplan inset A
ESA V2 Fig 7-12b Restoration Masterplan inset B
ESA V2 Fig 7-13 Restoration Masterplan Annotations
ESA V2 Fig 7-14 Restoration Masterplan Sections
ESA V2 Fig 7-15 to 7-17 Illustrative Views Viewpoints 7 10 and 11
ESA V2 Fig 7-18 Aerial Illustrating Indicative Landscape Mitigation
ESA V2 Fig 7-19 Single Frame View of Silos
ESA V2 Fig 7-20 Comparative ZTV
ESA V2 Fig 7-21 7-23 Artists Impressions Post Rest Viewpoints 9 TV 10 11
ESA V2 Fig 8-4 Land Retained within the Site
ESA V2 Fig 8-5 Bat Survey Results
ESA V2 Fig 8-6 Reptile Survey Area
ESA V2 Fig 9-3a - Site Wide Drainage Plan - Extraction Area
ESA V2 Fig 9-3b - Site Wide Drainage Plan - Main Processing Site
ESA V2 Fig 12-3 Extraction Scenario 1
ESA V2 Fig 12-4 Extraction Scenario 2
ESA V2 Fig 12-5 Extraction Scenario 3
ESA V2 Fig 12-6 Extraction Scenario 4
ESA V2 Fig 12-7 Extraction Scenario 5
ESA V2 Fig 12-8 Extraction Scenario 6
ESA V2 Fig 12-9 Extraction Scenario 7
ESA V2 Fig 12-10 Extraction Scenario 8
ESA V2 Fig 12-11 Extraction Scenario 9
ESA V2 Fig 12-12 Extraction Scenario 10
ESA V2 Fig 12-15 Low-Rise Bund Locations
ESA V2 Fig 12-16 Additional Noise Monitoring Locations
ESA V2 Fig 12-17 Additional Noise Sensitive Receptors
ESA V2 Fig 12-18 Soil Stripping HRP1
ESA V2 Fig 12-19 Soil Stripping HRP2
ESA V2 Fig 12-21 Soil Stripping HRP4
ESA V2 Fig 12-21 Soil Stripping HRP5
V2 Fig 12-23 Soil Stripping HRP6
ESA V2 Fig 12-24 Soil Stripping LRP1
ESA V2 Fig 12-25 Soil Stripping LRP2
ESA V2 Fig 12-26 Soil Stripping LRP3
ESA V2 Fig 12-27 Soil Stripping LRP4
ESA V2 Fig 12-28 Soil Stripping LRP5
ESA V2 Fig 12-29 Dig Down Locations
ESA V2 Fig 12-30 Dig Down 1 HRP1
ESA V2 Fig 12-31 Dig Down 2 HRP2
ESA V2 Fig 12-32 Dig Down 3 LRP3
ESA V2 Fig 12-33 Embankment Removal HRP1
ESA V2 Fig 12-34 Embankment Removal HRP2
ESA V2 Fig 12-35 Embankment Removal HRP3
ESA V2 Fig 12-36 Embankment Removal HRP4
ESA V2 Fig 12-37 Embankment Removal HRP5
ESA V2 Fig 12-38 Embankment Removal HRP6
ESA V2 Fig 12-39 Embankment Removal LRP1
ESA V2 Fig 12-40 Embankment Removal LRP2
ESA V2 Fig 12-41 Embankment Removal LRP3
-
ESA V3 Cover page and Contents
ESA V3 TA 1-3 Regulation 25 Letter
ESA V3 TA 3-2 Health Technical Note and Health Matrix
ESA V3 TA 5-1 Site Layout Plans
ESA V3 TA 5-2 Site Phasing Plans
ESA V3 TA 5-4 Site Restoration Plans Part 1
ESA V3 TA 5-4 Site Restoration Plans Part 2
ESA V3 TA 8-4 Updated Biodiversity Net Gain Assessment
ESA V3 TA 8-7 Updated Habitat Data
ESA V3 TA 8-8 Bat Roost Assessment
ESA V3 TA 8-9 Invertebrate Habitat Assessment
ESA V3 TA 9-3 Revised Drainage Management Plan
ESA V3 TA 9-4 Environment Agency Flood Risk Slide Deck
ESA V3 TA 9-5 RCEP PFA Lagoons Bund Stability Analysis
ESA V3 TA 10-4 PFA Testing Details and Results
ESA V3 TA 12-1 Construction and Operational Plant Assumptions
ESA V3 TA 12-2 Interim Noise Technical Note (May 2023)
ESA V3 TA 13-6 Updated Dust Impact Assessment
-
IMPORTANT: The doucments linked below are macro-enabled spreadsheets. By default, some functionality may be switched off, and you may need to update your firewall settings to download them.
ESA V3 TA8.4 Appendix B NE Metric4.0 2 Year Delay
ESA V3 TA8.4 Appendix C NE Metric4.0 Phased Group 1
ESA V3 TA8.4 Appendix C NE Metric4.0 Phased Group 2
ESA V3 TA8.4 Appendix C NE Metric4.0 Phased Group 3
-
-
-
-
Site Wide Drainage Plan Extraction Area
Site Wide Drainage Plan Main Processing Site
Proposed Water Treatment Plant Elevations
Indicative Restoration Masterplan
Indicative Restoration Masterplan inset 1
Indicative Restoration Masterplan inset 2
Indicative Restoration Masterplan Annotations
Indicative Restoration Masterplan Sections
Main Processing Plant Site Layout
Materials Storage Building Elevations
Main Processing Plant Cross-Section
-
PLANNING APPLICATION DOCUMENTS
-
-
-
403.000007.00001.12.001.0_Outline_Site_Layout-A3
403.000007.00001.12.002.0_Main_Processing_Plant-A2
403.000007.00001.12.003.0_Optimisation_Stage-A2
403.000007.00001.12.004.0_Office_Elevations-A3
403.000007.00001.12.005.0_Materials_Storage_Building_Elevations-A2
403.000007.00001.12.006.0_Silos_Elevations-A3
403.000007.00001.12.007A.0_Drying_Module_Elevations-A3
403.000007.00001.12.007B.0_Drying_Module_Elevations-A3
403.000007.00001.12.008.0_CHP_Unit_Elevations-A3
403.000007.00001.12.009.0_Cross-Section-A1
403.000007.00001.12.010.0_Gas_Tank_Elevations-A1
403.000007.00001.12.011.0_Weighbridge_Elevations-A1
403.000007.00001.12.012.0_Wheel_Wash_Elevations-A3
403.000007.00001.12.013.0_Gas_Main_Elevations-A3
403.000007.00001.12.014.0_Temp_Processing-A1
403.000007.00001.12.015.0_Conveyor_Crossing-A1
403.000007.00001.12.016.0_Mobile_Screen-A2
403.000007.00001.12.017.0_PFA_Lagoons
403.000007.00001.12.018.0_PFA_Cross_Sections
403.000007.00001.12.019.0_Temporary_Haul_Road-A1
403.000007.00001.12.020-030.0_Phasing_Combined
4092_DR_LAN_101 Indicative Landscape Restoration Masterplan
4092_DR_P_0004 Outline Dewatering and Drainage Management Strategy (Extraction Area)
4092_DR_P_0005 Outline Dewatering and Drainage Management Strategy (Main Processing Site)
4092-DR-P-0006 Swept Path Analysis Powder Tanker.
4092-DR-P-0008-Existing Site Access
4092-REP-042 Site Location Plan Aerial
4092-REP-043 Site Area Plan
4092-REP-072 Site Location Plan -
ES_Vol_1_Chapter 1 Introduction
ES_Vol_1_Chapter 2 EIA Methodology
ES_Vol_1_Chapter 3 EIA Technical Engagement
ES_Vol_1_Chapter 4 Site Location and Description
ES_Vol_1_Chapter 5 Project Description
ES_Vol_1_Chapter 6 Planning Policy
ES_Vol_1_Chapter 7 Landscape and Visual
ES_Vol_1_Chapter 8 Ecology and Ornithology
ES_Vol_1_Chapter 9 Hydrology hydrogeology and Flood Risk
ES_Vol_1_Chapter 10 Ground Conditions
ES_Vol_1_Chapter 11 Cultural Heritage
ES_Vol_1_Chapter 12 Noise
ES_Vol_1_Chapter 13_Air Quality
ES_Vol_1_Chapter 14 Traffic and Transport
ES_Vol_1_Chapter 15 - Climate Change
ES_Vol_1_Chapter 16 Sustainability
ES_Vol_1_Chapter 17 Interaction and Accumulation of Effects
ES_Vol_1_Chapter 18 Conclusions -
ES_Vol_2__Figures cover and content
ES_Vol_2_Fig 1.1 Site Location Plan
ES_Vol_2_Fig 1.2 Site Location Plan Aerial
ES_Vol_2_Fig 1.3 Site Area Plan
ES_Vol_2_Fig 1.4 Constraints Plan
ES_Vol_2_Fig 2.1 Cumulative Site Plan
ES_Vol_2_Fig 7.1 Core LVIA Study Areas
ES_Vol_2_Fig 7.2 Aerial Mapping
ES_Vol_2_Fig 7.3 Topography
ES_Vol_2_Fig 7.4 Existing Bare Earth ZTV with Viewpoint Locations
ES_Vol_2_Fig 7.5 Existing Screened ZTV with Viewpoint Locations
ES_Vol_2_Fig 7.6a East Midlands Landscape Character Areas
ES_Vol_2_Fig 7.6b Local Landscape Character Areas
ES_Vol_2_Fig 7.7 Landscape Designations
ES_Vol_2_Fig 7.8 Visual Amenity
ES_Vol_2_Fig 7.9 Transport and Recreational Routes
ES_Vol_2_Fig 7.10 Cumulative Sites
ES_Vol_2_Fig 7.11 Existing Viewpoints 1-12
ES_Vol_2_Fig 7.12 Indicative Landscape Restoration Masterplan
ES_Vol_2_Fig 8.1 Site Boundary and Designated Sites
ES_Vol_2_Fig 8.2 Survey Areas and Access Restrictions
ES_Vol_2_Fig 8.3 SSSI Features in Relation to the Site
ES_Vol_2_Fig 9.1 Core Study Area
ES_Vol_2_Fig 9.2 Wider Study Area
ES_Vol_2_Fig 9.3 Outline Dewatering and drainage management strategy (Extraction Area)
ES_Vol_2_Fig 9.4 Schematic Cross Section of the Excavation Area.
ES_Vol_2_Fig 12.1 - Noise Monitoring Locations
ES_Vol_2_Fig 12.2 - Noise Sensitive Receptors
ES_Vol_2_Fig 12.3 - Scenario 1 Noise
ES_Vol_2_Fig 12.4 - Scenario 2 Noise
ES_Vol_2_Fig 12.5 - Scenario 3 Noise
ES_Vol_2_Fig 12.6 - Scenario 4 Noise
ES_Vol_2_Fig 12.7 - Scenario 5 Noise
ES_Vol_2_Fig 12.8 - Scenario 6 Noise
ES_Vol_2_Fig 12.9 - Scenario 7 Noise
ES_Vol_2_Fig 12.10 - Scenario 8 Noise
ES_Vol_2_Fig 12.11 - Scenario 9 Noise
ES_Vol_2_Fig 12.12 - Scenario 10 Noise
ES_Vol_2_Fig 12.13 - Scenario 11 Noise
ES_Vol_2_Fig 12.14 - Night-time Noise
ES_Vol_2_Fig 13.1 Existing Sensitive Receptor Locations ER1-ER8
ES_Vol_2_Fig 13.2 Existing Sensitive Receptor Locations ER9-ER11
ES_Vol_2_Fig 13.3 Existing Sensitive Receptor Locations ER12-ER16
ES_Vol_2_Fig 13.4 Existing Sensitive Receptor Locations ER17-ER22
ES_Vol_2_Fig 13.4 Existing Sensitive Receptor Locations ER17-ER22
ES_Vol_2_Fig 13.5 Ecological Sensitive Receptor Locations -
ES_Vol_3__Cover and Contents
ES_Vol_3_Appendix_1.1_EIA Scoping Report
ES_Vol_3_Appendix_1.2_ EIA Scoping Opinion
ES_Vol_3_Appendix_3.1_Social, Health and Wellbeing Impacts Technical Note
ES_Vol_3_Appendix_3.2_Nottinghamshire Rapid Health Impact Assessment Matrix
ES_Vol_3_Appendix_4.1_PFA Lagoons Figure
ES_Vol_3_Appendix_4.2_Geological Cross Section Figure
ES_Vol_3_Appendix_4.3_Site Photos
ES_Vol_3_Appendix_5.1_Site Layout Plans
ES_Vol_3_Appendix_5.2_Site Phasing Plans
ES_Vol_3_Appendix_5.3_OCEMP
ES_Vol_3_Appendix_7.1_LVIA Methodology
ES_Vol_3_Appendix_7.2_Visual Assessment Methodology
ES_Vol_3_Appendix_7.3_Cumulative LVIA Methodology
ES_Vol_3_Appendix_7.4_Zone of Theoretical Visibility (ZTV) Methodology
ES_Vol_3_Appendix_7.5_Cumulative LVIA (CMLVIA) Tables
ES_Vol_3_Appendix_7.6_Landscape Analysis Tables
ES_Vol_3_Appendix_7.7_Visual Analysis Tables
ES_Vol_3_Appendix_7.8_Arboricultural Survey
ES_Vol_3_Appendix_8.1_Ecology Survey Report
ES_Vol_3_Appendix_8.3_Ornithology Survey Report
ES_Vol_3_Appendix_8.4_Biodiversity Net Gain Assessment
ES_Vol_3_Appendix_8.5_Outline Restoration Strategy
ES_Vol_3_Appendix_8.6_Outline Monitoring and Mitigation Plan
ES_Vol_3_Appendix_9.1_WEMP
ES_Vol_3_Appendix_9.2_Flood Risk Assessment
ES_Vol_3_Appendix_9.3_Drainage Management Plan
ES_Vol_3_Appendix_10.1_PLQRA
ES_Vol_3_Appendix_10.2_ALC Survey Area A
ES_Vol_3_Appendix_10.3_ ALC Survey Area B
ES_Vol_3_Appendix_11.1_ Historic Environment Desk-Based Assessment
ES_Vol_3_Appendix_12.1_Construction and Operational Noise Plant List
ES_Vol_3_Appendix_13.1_to_13.4_Air Quality
ES_Vol_3_Appendix_13.5_ACCON Air Quality Assessment
ES_Vol_3_Appendix_13.6_Lound Processing Facility Dust Impact Assessment
ES_Vol_3_Appendix_13.7_Lound Processing Facility Dust Management Plan
ES_Vol_3_Appendix_14.1_Transport Statement
ES_Vol_3_Appendix_15.1_GHG Technical Methodology and Data -